11 February 2021
10 July 2020
The numbers say it all: – 10568 m² floor VIGOR; – 2,800 cubic meters of concrete produced in 90 days; – 527 prefabricated elements
11 March 2020
Sicep Tunisie has started the assembly of DENIM HOUSE. Location: Ksar Ellal Surface area: 11.000 sqm Use: Textile factory Costruction system: multi-l
6 November 2019
Sicep Tunisie has started the assembly of "Bontaz Centre"
24 September 2019
23 September 2019
Sorry, this entry is only available in French and Italian.