SICEP TUNISIE STARTED THE ASSEMBLY OPERATIONS FOR “BONTAZ CENTRE””
Posted on: 6 November 2019

Sicep Tunisie has started the assembly of “Bontaz Centre” on november 05, 2019, the day of the inauguration of the construction site.
Location: Tunisi
Surface area: 5.580 sqm
Use: Factory spare parts auto
Costruction system: System I