BRIDGE BEAMS for TECNIS (TUNIS FAST RAIL NETWORK)

Sicep Tunisie has provided TECNIS (on behalf of the final Customer, R.F.R. = Tunis Fast Rail Network) with pre-stressed beams for the construction of a bridge being part of Tunis’s fast rail network, Line D. This is a double arch bridge made of continuous beams, each of which is 20 m long.

The solution of precast pre-stressed beams by adherent cables, adopted for the first time in Tunisia for a bridge, has allowed to carry out the crossover without interrupting the operation of the railway line passing below.